Installed by
brewery-approved
engineers

Installed by
brewery-approved
engineers

Linemate Installation and servicing

Installing Linemate normally takes us less than a day and does not interrupt trade. The bar installation can be completed in an hour or two, normally before opening. It consists of a drain with connections to each group of pumps, plumbed into a sink, dishwasher, or icemaker drain, using a self-tapping connector.

Specially designed drainpipes snap on at each station with a short hose containing a sight glass and rubber end that fits over the font nozzle.

The Linemate cellar units are placed on any convenient wall space.

The Cellar Control Keypad can be placed anywhere, normally near the cellar entrance. A mains electrical socket and water supply are the only requirement. The latter can be tapped into at any point.

Experienced, brewery-approved installation engineers carry out all installations.